ADU Company in Irvine, CA
Kitchen remodeling in Irvine, CA comes with a set of constraints most contractors in neighboring cities never see: HOA design review, strict municipal ADU ordinances, and housing stock from the 1970s through 2000s that was built to planned-community standards, not modern open-concept expectations. Silverleaf ADU Builders handles the full scope: ADU construction, bathroom remodeling, and kitchen remodeling under one roof, so your kitchen renovation doesn’t stall while you coordinate a separate ADU crew. Call (833) 404-5214 for a free estimate.
Why Irvine Homes Are Different
Irvine isn’t a patchwork of unincorporated land that gradually became a city. It’s a master-planned community where nearly every single-family home sits inside an HOA with CC&Rs that dictate what you can build, where you can park, and how your roofline must look. That changes the sequence of any kitchen remodel: before you pick cabinets, you’re often working through HOA architectural review for exterior changes like vent routing, window relocations, or a bump-out that affects the elevation. Irvine’s own municipal ADU ordinance is also stricter than California state law in some respects, so if your kitchen remodel is paired with an ADU, both layers of review apply.
The housing stock matters too. Homes in Woodbridge, Northwood, and Westpark are mostly wood-frame, stucco, and tile-roof construction from the 1970s through 2000s, on small, tightly platted lots. That means kitchens in these homes were framed for a different era: load-bearing walls where today’s buyers want an island, soffits hiding ductwork, and electrical panels that predate modern appliance loads. Silverleaf ADU Builders has served Irvine since 2016 and plans around these realities from the first site visit.
Our Main Irvine Services
Two services account for most of the calls we get from Irvine homeowners: ADU construction and bathroom remodeling. Both run through the same HOA and city review processes, and both benefit from a contractor who already knows the city’s permitting rhythm.
ADU Builders in Irvine
Building an ADU in Irvine means working with the city’s stricter-than-state standards on setbacks, lot coverage, and in many older villages, greenbelt easement reviews that a Santa Ana or Tustin contractor wouldn’t anticipate. We’re brand-agnostic: hands-on experience with Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, and Tuff Shed means we match the build method to your lot rather than forcing one system. Find the build method that fits your lot, your timeline, and your budget. ADU Builders in Irvine.

Bathroom Remodeling in Irvine
Bathroom remodels in Irvine’s 1970s – 2000s homes often mean relocating plumbing on slab foundations, which changes both cost and timeline. We handle the plumbing, waterproofing, James Hardie fiber-cement backer systems, and finish work as one continuous scope, no separate shower-pan subcontractor. Bathroom Remodeling in Irvine.

What happens when you call
- 1
A real person answersNo phone trees — you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Kitchen Remodeling in Irvine
Kitchen remodeling in Irvine is shaped by three things: homes built between the 1970s and 2000s with compartmentalized floor plans, HOA and city review layers that affect exterior-facing changes, and a local climate where year-round use makes ventilation and indoor air quality real design factors, not afterthoughts. We make the process simpler by handling the project as one continuous scope, from structural work through finish cabinetry, with Kitchen Remodeling expertise that spans both the construction phase and the interior details. Irvine’s warm, dry summers make a high-CFM range hood and sealed ducting more important than they would be in a coastal fog belt, and occasional Santa Ana winds mean any vent penetration needs proper sealing against ember intrusion.
Load-Bearing Wall Removal
Signs you need it
Your Irvine kitchen from the 1970s – 2000s has a wall separating the kitchen from the living or dining room, and you want an open plan.
What it costs in Irvine
Load-bearing wall removal in Irvine typically runs $4,200 – $9,800 depending on beam span and whether the wall carries a second story.
How we do it
We engineer the beam (LVL or steel), pull the Irvine permit, install temporary shoring, frame the opening, and patch stucco and drywall to match the existing home.
Full Kitchen Renovation
Signs you need it
Your cabinets, counters, flooring, and layout haven’t been touched since the home was built, and the kitchen no longer works for how you live.
What it costs in Irvine
A full kitchen renovation in Irvine typically ranges from $35,000 – $75,000 depending on finish level, layout changes, and whether plumbing or electrical relocations are required.
How we do it
We handle demolition, plumbing and electrical updates, drywall, cabinet installation, countertop fabrication, tile, and finish trim as one coordinated scope with one project lead.
What Kitchen Remodeling Costs in Irvine
| Item | Typical range in Irvine |
|---|---|
| Load-bearing wall removal | $4,200 – $9,800 |
| Full kitchen renovation | $35,000 – $75,000 |
| Cabinet refacing | $6,500 – $14,000 |
What pushes price up in Irvine: HOA-required material changes, slab-foundation plumbing relocations, and load-bearing walls common in 1970s – 2000s planned-community framing. We quote a fixed price with a written line-item scope, so the number you approve is the number you pay.
How long does a kitchen remodel take in Irvine?
Most Irvine kitchen remodels take 6 – 12 weeks, with load-bearing wall removal and slab plumbing work adding time. HOA review can add 2 – 4 weeks before permits are even submitted. Call (833) 404-5214 for a timeline specific to your street.
Will my HOA need to approve the kitchen remodel?
Interior-only kitchen work usually doesn’t need HOA review in Irvine, but any exterior penetration, window change, or vent relocation does. We read your CC&Rs and hand you the exact list before you spend a dollar on design. Call (833) 404-5214 for help.
Brands We Service in Irvine
Silverleaf ADU Builders works hands-on with a defined roster of prefab and modular ADU brands, including Cover, Mighty Buildings, and Boxabl. If you’re weighing a prefab system against a site-built ADU, we can walk you through what each product line actually costs and what it performs like in Irvine’s climate. Our brands.
Pricing for ADU Company in Irvine, CA
| Service | Typical range in Irvine |
|---|---|
| Kitchen remodel (full) | $35,000 – $75,000 |
| Load-bearing wall removal | $4,200 – $9,800 |
| Cabinet refacing | $6,500 – $14,000 |
| Bathroom remodel (full) | $18,000 – $40,000 |
| Bathroom remodel (guest/powder) | $8,000 – $18,000 |
| ADU (prefab, turnkey) | $180,000 – $350,000 |
| ADU (site-built, custom) | $250,000 – $450,000 |
| Garage conversion ADU | $120,000 – $200,000 |
| ADU site work and utilities | $30,000 – $70,000 |
What pushes prices up in Irvine is rarely the structure itself: it’s HOA compliance, greenbelt or slope easement review on older village lots, and slab-foundation work where plumbing must move. Silverleaf ADU Builders quotes fixed prices with written line-item scopes, no change orders unless you change the scope.
Neighborhoods We Serve in Irvine
We work across Irvine’s villages and planned communities, from the 1970s-era housing stock in Woodbridge and Culverdale to the newer builds in Northwood and the hillside lots in Turtle Rock. Each neighborhood has its own CC&R quirks; we read them before quoting so the estimate you get is the one that survives architectural review.
- Woodbridge
- Northwood
- Westpark
- Turtle Rock
- Culverdale
Response time across the city is typically 1 – 2 business days for an estimate; we schedule site visits by ZIP (92697, 92710, 92602, 92603) to batch drive time efficiently.
Service Area – Cities Near Irvine
Silverleaf ADU Builders works throughout central Orange County, including Tustin, CA, Aliso Viejo, CA, Santa Ana, CA, and North Tustin, CA. If you’re just outside Irvine, the HOA and permit landscape changes quickly, and we’ll tell you what applies before we quote.
Serving Irvine, CA — Our Local Coverage Area
We’re based in the Irvine area and know this community well. Use the map below to see our service coverage — if you’re nearby, we can almost certainly help.
FAQs About ADU Company in Irvine
Yes. We pull all city of Irvine permits and pass inspections as a standard part of every kitchen remodel, bathroom remodel, and ADU project. HOA architectural review is separate; we prepare your submittal packet so it moves through without a resubmit cycle. Call (833) 404-5214 to start.
Most Irvine kitchen remodels start 3 – 6 weeks after you approve the scope, depending on HOA review (if exterior work is involved) and city permit turnaround. Straightforward interior remodels usually start sooner. Call (833) 404-5214 and we’ll give you a date before you sign anything.
Yes. One project lead, one contract, one coordinated schedule. If your lot can support both, we sequence the work so the ADU foundation and kitchen remodel don’t conflict on the same days. From foundation to finished kitchen, one team handles it. Call (833) 404-5214 for a free estimate.
What happens when you call
- 1A real person answersNo phone trees — talk to a local adu pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3We come out and measureLicensed & insured, at a time that suits you — the visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Irvine Customers Say
"Unit came out great and the tenant is happy. The timeline ran long, largely because of how slow the city was on plan check, though a couple of the delays were scheduling on their end."
— Emily Wong"Garage conversion to a one bedroom unit. He handled the plans, the city submittal, and every round of corrections. Took six months from first meeting to final inspection and he never once made the permit process my problem."
— Marcus Carter"Knew the local setback and parking rules cold, which saved us from designing something that would never have been approved."
— Carlos Guzman